AI/ML in Energy5 min read
Power Is the New Chip Constraint: What AI Compute Means for DISCOMs
Rack power is heading from 5-10 kW to 240 kW and AI loads swing in milliseconds. What that means for grid connection rules and DISCOM finances in India.
Practical notes on smart metering, AI in energy, loss reduction and leading large utility programs.
3 results tagged #DISCOMs · Clear filters
AI/ML in Energy5 min read
Rack power is heading from 5-10 kW to 240 kW and AI loads swing in milliseconds. What that means for grid connection rules and DISCOM finances in India.
Smart Utilities5 min read
India added 8.2 GWh of battery storage in 1H 2026. Recent tenders show four procurement models, and the real test for DISCOMs is dispatch, metering and contract design.
Smart Utilities5 min read
India's 1H 2026 tenders put storage and hybrid projects above 58% of auctioned capacity, and Bihar's draft would make storage obligations binding on distribution licensees.